Lake Leake Dam Outlet Valve Replacement

Client

Tasmanian Irrigation

Project Value

$250,000

Services

Water Infrastructure

The Lake Leake project involved the replacement of the corroded outlet works at the Lake Leake Dam, located in Tasmania's Eastern Midlands. The dam holds approximately 22 gigalitres of water and was originally commissioned in 1883 to provide Campbell Town with a permanent water supply.

IPD Consulting was engaged initially to provide a concept design and construction methodology which once endorsed, progressed to providing a detailed design for construction, including construction inspections, commissioning and sign off.