Projects

Heavy Machinery Washdown Facility

Construction of a covered industrial washdown facility and water treatment infrastructure, with washdown bay of 6m clear height, 10m x 12m plan area and suitable of accommodating up to a 40 tonne excavator or 30 tonne wheel loader.

Client:  Komatsu Australia Pty Ltd, Tasmania

Project Value:  $100K

Services Provided:  IPD undertook the preliminary design, detailed structural design, regulatory approvals and construction site engineering inspections.